Log Cabin Prefab Homes Modular Manufacturing

Product Details
Customization: Available
After-sales Service: Free Lifetime Technical Consultant
Usage: Warehouse, Villa, Dormitories, Temporary Offices, Workshop, Living House
Still deciding? Get samples of US$ 120/Square Meter
Request Sample
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2016

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (16)
  • Log Cabin Prefab Homes Modular Manufacturing
  • Log Cabin Prefab Homes Modular Manufacturing
  • Log Cabin Prefab Homes Modular Manufacturing
  • Log Cabin Prefab Homes Modular Manufacturing
  • Log Cabin Prefab Homes Modular Manufacturing
  • Log Cabin Prefab Homes Modular Manufacturing
Find Similar Products
  • Overview
  • Product Description
  • Packaging & Shipping
  • Certifications
  • FAQ
  • Our Service
Overview

Basic Info.

Model NO.
RCB387
Delivery Detail
with 25 Days
Color
Optional
Certification
ISO, CE
Customized
Customized
Warranty
Free Lifetime Technical Consultant
Material
Steel Frame+AAC Panel
Transport Package
Material with Proper Package Before Loading Into C
Specification
Section steels customized
Trademark
Yuanda
Origin
China
HS Code
9406000090
Production Capacity
400000 Cubic Meter

Product Description


Product Description

 

Eco-friendly Environmentally friendly construct process and materials, 70% recycle materials
Anti-seismic,wind resistant and durable 70 years structure guarantee, anti-seismic performance for up to grade 9 seismic events,and resistance to grade 12 typhoons
Superior thermal and heat insulation Premium insulation material used to form an insulation layer
Good sound insulation Wall sound insulation:45db or higher (four-star hotel standard);floor sound insulation:65db or less (five-star hotel standard)
Superior air humidity regulation AAC panels are adopted to make the walls breathe,high strength
Short construction period Fast construction reduces our construction period by 50% compared with traditional construction methods
Light weight,low foundation cost,increased usable area With the enclosure wall thickness ranging from 14cm to 20cm,the usable floor area is 10% more than that of concrete structure buildings
Good compatibility of integrated buliding material Advanced solar energy system;Central vacuum system preventing pollution during dust suction;Household-based central air conditioning;Anti-theft system,video intercom system.
Log Cabin Prefab Homes Modular Manufacturing

Log Cabin Prefab Homes Modular ManufacturingLog Cabin Prefab Homes Modular Manufacturing

Log Cabin Prefab Homes Modular Manufacturing

Packaging & Shipping

Log Cabin Prefab Homes Modular Manufacturing

 

Log Cabin Prefab Homes Modular Manufacturing

Log Cabin Prefab Homes Modular ManufacturingLog Cabin Prefab Homes Modular Manufacturing

Certifications


Log Cabin Prefab Homes Modular Manufacturing

FAQ


1. How long does it take to produce a constructive system?
Generally,30 days are required to produce a villa or a steel structure building steel structure warehouse or after confirming the architectural level, indicated in the quote

2. How many containers required for my project ?
After confirmation of your request , we send our shipping calculate weight and overall dimensions of all building materials department . After the calculation, we send you our answer. In general, a 40-foot container is required for the transport of a building with an area of 80m2.

3. What are the mandatory information to send you to get a quote?
After receiving your first quote, we will send you a complete array that contains all the information we need.
4. How to ensure that the structure meets the criteria for local buildings ?

Our structures are in line with national and European standards (CE certificate) and our ALC panels are under the process of applying Code mark certificate. We use the Japan and Australian building technologies and calculations are made according to the rules of art.

5. Is the building system resistant to hurricanes and earthquakes?
Ideally , the process of construcion based modular steel frames has been developed in Japan to address critical environmental conditions. The strength of steel and modular construction allow the absorption of large loads generated during disasters. Buildings withstand earthquakes of level 5-6 on the Richter scale and cyclone with sustained winds up to 40m/s.

Our Service

1. Different kinds of professional team such as engineer team, production team,quality inspection team and installation team etc. make sure the guarantee for all of your rational requirements.

2. Free for AAC panel sample to dispel your misgivings.

3. All-the-way tracking for our products till you finish the installation.

4. Long time warranty for insurance. 5. Professional installation team including engineers will assist client to finish the whole project in your country. Or we will supply full services for installation.


 
 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier