Item Compared | Tranditional System | Chinese System |
Foundation | The trough foundation requires high precision, the mold pouring is difficult, the construction period is long, and the foundation cost is high | Raft foundation, simple construction steps, lower cost |
Difficult to carry materials on site | The bulk density of 140mm plates is 2500 kg per cubic meter. The construction must be hoisted by machinery, which is inefficient and inconvenient. | The bulk density of the ALC board is 500 kg per cubic meter, and the weight of a single steel structure beam and column does not exceed 50 kg. All of them can be handled manually without mechanical hoisting. |
Structural safety | Frameless slab system, no steel structure beam and column support | The steel frame + ALC board system is adopted, and the ALC board, the roof composite board and the steel structure main body are reliably connected to provide support and skinning for the overall structure |
Service life | No frame structure, poor wind resistance, foundation settlement during the service life | Steel structure frame, strong resistance to wind load, long service life |
Classroom space adjustment | It is difficult to carry out structural transformation after the wall panels are poured into the foundation U-shaped groove | The position of the plate can be adjusted freely without affecting the steel structure system, which is convenient for the flexible adjustment of the internal space layout |
Recyclable | There are almost no recyclable materials in the later period (only a few steel beams) | Both steel structure and ALC board can be recycled, transformed and reused |